For the last few years I have wanted to install a teak & holly floor in Changing Channels. This year was the year I finally made it happen.
Below are the details and pictures:
Step 1 Making patterns out of cheap plywood first.
Step 2 laying out the patterns on teak panels.
Step 3 install it in the boat.
Step 4 finish with satin polyurethane and put cabin back together.
Matt O'Donnell
Changing Channels
1967 38' Express